Why choose Airborne Very Berry Gummies?
Airborne Very Berry Gummies offer a delicious and convenient way to supplement your daily vitamin C intake. Each two-gummy serving provides 750 mg of vitamin C, along with a blend of antioxidants including vitamins A, C, E, zinc, selenium, manganese, magnesium, and an herbal blend with echinacea and ginger. This formula is designed to support the normal functioning of the immune system, as backed by EFSA-authorized health claims. Additionally, they are gluten-free and suitable for both men and women.
Benefits of vitamin C and other nutrients
Vitamin C contributes to the normal functioning of the immune system and the protection of cells from oxidative damage (EFSA claims). Each two-gummy serving provides 750 mg of vitamin C, plus vitamin A, vitamin E, zinc, selenium, manganese, and magnesium. Zinc also contributes to the normal functioning of the immune system. The herbal blend with echinacea and ginger complements the formula, although its effects do not have EFSA-approved health claims.
Antioxidants in each serving
In addition to vitamin C, Airborne Very Berry Gummies contain vitamin A and E, as well as minerals such as zinc and selenium, which contribute to the protection of cells from oxidative damage (EFSA claims). The combination of these nutrients offers comprehensive antioxidant support. The herbal blend with echinacea and ginger has traditionally been used for general well-being, although its effects are not supported by specific health claims.
Recommended dosage
The recommended daily dose is two gummies, which provides 750 mg of vitamin C. Each bottle contains 21 gummies, equivalent to 10.5 servings. Do not exceed the recommended daily dose. Food supplements should not be used as a substitute for a balanced diet. Keep out of reach of young children.
Types of vitamin C: ascorbic acid or ascorbate?
This product uses ascorbic acid, the most common and studied form of vitamin C. Ascorbic acid is well absorbed by the body and is the standard form in most supplements. If you have a sensitive stomach, you may consider buffered forms like sodium ascorbate, but for most people, ascorbic acid is effective and well-tolerated.
Ingredients and quality
Airborne uses high-quality ingredients. The gummies are sweetened with sugar and glucose syrup, and contain natural berry, citrus, and grapefruit flavors, offering a delicious taste that makes them easy to take. They are gluten-free. The product includes a blend of vitamins (A, C, E), minerals (zinc, selenium, manganese, magnesium), and herbal extracts (echinacea, ginger). For a complete list of ingredients, consult the product label.
Why gummies instead of tablets?
Gummies are an attractive alternative for those who have difficulty swallowing tablets or simply prefer a more pleasant format. Airborne Very Berry Gummies offer a soft texture and fruity flavor that makes it easier to adhere to daily supplementation. In addition, they are formulated to be effective for both men and women, adapting to different nutritional needs.
Frequently asked questions
How much vitamin C do I need per day?
The reference intake for adults in the EU is 80 mg per day. However, many people opt for higher doses for immune support. This product provides 750 mg per serving, well above the reference intake, but within the limits considered safe for most adults (the tolerable upper limit is 2000 mg per day).
Do the gummies contain gluten?
No, these gummies are gluten-free, according to the manufacturer.
Can they be taken long-term?
As with any supplement, it is recommended to follow the indicated dose and consult a healthcare professional if prolonged use is planned or if you have pre-existing medical conditions.
How to use and store
Take two gummies daily, preferably with a meal. Keep the container closed in a cool, dry place. Do not expose to high temperatures. This product is designed for adults and children aged 12 and over (consult a pediatrician for minors).
Warning: Food supplements should not be used as a substitute for a balanced diet. Do not exceed the recommended daily dose. Keep out of reach of young children.